A Framework For Digital Model Checking Ahmed Kamal Work conducted under supervision of: Jose Granja Ricardo Camarinha (tutor in company) Dissertation location: University of Minho | 2019/2020 |
Project Visual Planning - Structured and optimized processes to integrate 4D and 5D BIM to plan construction activities Alessandro Vacante Work conducted under supervision of: Claudio Mirarchi Stefano Amista (tutor in company) Dissertation location: Politecnico di Milano | 2019/2020 |
BIM QA/QC procedures based on Lessons Learned from Constructability issues Ana Gloria de Luna Guajardo Work conducted under supervision of: Tomo Cerovšek Dissertation location: University of Ljubljana | 2019/2020 |
Data flow from BIM to Digital Twins André Malheiro Work conducted under supervision of: Alberto Pavan Jose Oliveira (tutor in company) Dissertation location: Politecnico di Milano | 2019/2020 |
Guidelines for preparation of OIR (Organizational Information Requirements) document for Miastoprojekt Wrocław following ISO 19650 Anna Kiczak Work conducted under supervision of: Claudio Mirarchi Dissertation location: Politecnico di Milano | 2019/2020 |
BIM approached Sustainable Design Methods Arlind Dervishaj Work conducted under supervision of: Tomo Cerovšek Dissertation location: University of Ljubljana | 2019/2020 |
Information management workflow for the construction and operation phases on a BIM process Bianca Cavedon Fontana Work conducted under supervision of: Hélder S. Sousa Isabel Valente José Carlos Lino (tutor in company) Dissertation location: University of Minho | 2019/2020 |
Integrated Surface-Subsurface BIM Design Workflows for Technological Facilities Camila Andrea Sandoval Bustos Work conducted under supervision of: Tomo Cerovšek Franc Sinur Dejan Grigillo Dissertation location: University of Ljubljana | 2019/2020 |
BIM-based Framework for Deconstructability Assessment of Steel Structures Camilo Mercado Siles Work conducted under supervision of: Maria Isabel Brito Valente Dissertation location: University of Minho | 2019/2020 |
Geotechnical BIM for Quantity Take-off in Tunnelling Strucutres with Ground Deformation Cristian David Pinzon Rincon Work conducted under supervision of: Aleksander Srdić Tomo Cerovšek Dissertation location: University of Ljubljana | 2019/2020 |
BIM-based cost estimation at early stages based on historical data Diogo Ferronato Work conducted under supervision of: Hélder Manuel da Silva e Sousa Bruno Acácio Ferreira Figueiredo Nuno Miguel Mota Alves Pires (tutor in company) Dissertation location: University of Minho | 2019/2020 |
Workflows for the Automation of 4D/5D simulation Ehab Attia Work conducted under supervision of: Aleksander Srdic Dissertation location: University of Ljubljana | 2019/2020 |
Algorithm-aided Information Design: Hybrid Design approach on the edge of Associative Methodologies in AEC Evgenii Ermolenko Work conducted under supervision of: Bruno Figueiredo Rui Dias (tutor in company) Dissertation location: University of Minho | 2019/2020 |
Computational design for construction site optimization Ezekiel Arito Work conducted under supervision of: Mario Caputi Dissertation location: Politecnico di Milano | 2019/2020 |
BIM based on-site investigations in retrofitting projects Fernando Da Silva Work conducted under supervision of: Vlatko Bosiljkov Dissertation location: University of Ljubljana | 2019/2020 |
Requirements and libraries in BIM based refurbishment of hydro-power-plants Filipe Finco Work conducted under supervision of: Tomo Cerovšek Dissertation location: University of Ljubljana | 2019/2020 |
Adoption of BIM for the extension project of the M5 metro line, 3D and 4D modeling of the "Parco-Villa Reale" Station in Monza Francesco Mauti Work conducted under supervision of: Cecilia Bolognesi Donato Antonio Saggese (tutor in company) Dissertation location: Politecnico di Milano | 2019/2020 |
How Digital Tools inform the Decision Making during the Design Process? The Case of the Environmental Planning with Life Cycle Assessment in BIM Environment. Georgios Triantafyllidis Work conducted under supervision of: Zanelli Alessandra Viscuso Salvatore Edwards Kristian Dissertation location: Politecnico di Milano | 2019/2020 |
BIM and BMS for the management of the building: the Manini Connect case for Digital Twin services Giovanni Coviello Work conducted under supervision of: Alessandro Zichi Stefano Bellini (tutor in company) Dissertation location: Politecnico di Milano | 2019/2020 |
Guidelines for BIM Information Management at Design Stage Giulia Terrosi Work conducted under supervision of: José Carlos Lino Daniel Oliveira Francisco Reis (tutor in company) Dissertation location: University of Minho | 2019/2020 |
The role of Computational Design in BIM Greta Rossi Work conducted under supervision of: Matevž Dolenc Dissertation location: University of Ljubljana | 2019/2020 |
HBIM for sustainable reuse Jelena Zuric Work conducted under supervision of: Miguel Azenha Alessandro Zichi Dissertation location: Politecnico di Milano | 2019/2020 |
Business Intelligence Data Centre for the Construction Industry João Vieira Work conducted under supervision of: Tomo Cerovšek Dissertation location: University of Ljubljana | 2019/2020 |
Taking Jichang Garden as an Example, an Attempt to Restore Jiangnan Garden of Ming Dynasty Lizhen Qin Work conducted under supervision of: Daniela Oreni Dissertation location: Politecnico di Milano | 2019/2020 |
Coordinated specification and quantity take-off through digital modelling Lucas Lima Vieira Work conducted under supervision of: Miguel Azenha José Granja Marta Campos (tutor in company) Dissertation location: University of Minho | 2019/2020 |
Interoperability framework for BIM-FM based on a relational database Marina Bacichett Trabulci Work conducted under supervision of: Miguel Ângelo Dias Azenha Jure Česnik (tutor in company) Dissertation location: University of Minho | 2019/2020 |
BIM as a multiscale facilitator for built environment analysis Matteo Mandrile Work conducted under supervision of: Tomo Cerovšek Milan Tomac Dissertation location: University of Ljubljana | 2019/2020 |
Geotechnical Data Management in BIM Environment Md Tousif Rahman Work conducted under supervision of: Janko Logar Tomo Cerovšek Dissertation location: University of Ljubljana | 2019/2020 |
Opportunities of Platform Buisness Model in Construction Mewail Gidey Work conducted under supervision of: Žiga Turk Dissertation location: University of Ljubljana | 2019/2020 |
Interoperability between BIM and CVE for energy and acoustic analysis Mija Sušnik Work conducted under supervision of: Lavinia Chiara Tagliabue Dissertation location: Politecnico di Milano | 2019/2020 |
Collaborative BIM Environments: Mitigating Cybersecurity Threats in the Design Phase Muammer Semih Sonkor Work conducted under supervision of: Žiga Turk Dissertation location: University of Ljubljana | 2019/2020 |
A framework for BIM-based assessment of seismic performance of existing RC buildings Muhammad Yasir Work conducted under supervision of: Miguel Azenha Hugo Rodrigues Luís Guichard Castro (tutor in company) Dissertation location: University of Minho | 2019/2020 |
BIM based development of bill of materials with case studies Nabih Mousharbash Work conducted under supervision of: Tomo Cerovšek Dissertation location: University of Ljubljana | 2019/2020 |
Standards, codifications, and Classifiactions for a General Contractor Nikola Berić Work conducted under supervision of: Mario Caputi Dissertation location: Politecnico di Milano | 2019/2020 |
Automated procedures for LCA analysis on a BIM project Orjola Braholli Work conducted under supervision of: Alessandro Zichi Dissertation location: Politecnico di Milano | 2019/2020 |
Building Information Modeling for Construction Sites Safety Planning Rebekali A Assumi Work conducted under supervision of: Mario Caputi Dissertation location: Politecnico di Milano | 2019/2020 |
BIM For Architectural Design Exploration and Representation Roger Peicho Work conducted under supervision of: Mitja Košir Dissertation location: University of Ljubljana | 2019/2020 |
The Urban and Architectural Design of the MONZA FS Station (Milan Metro Line 5 – New Extension to Monza) Sara Ben Lashihar Work conducted under supervision of: Cecilia Maria Bolognesi Dissertation location: Politecnico di Milano | 2019/2020 |
The use of BIM for Design-Build-Relocate buildings Vanesa Antonela Valentina Bertero Work conducted under supervision of: Tomo Cerovšek Žiga Babnik Dissertation location: University of Ljubljana | 2019/2020 |
A Conceptual Framework for effective BIM-enabled Information Management in Railways Vikas Singhal Work conducted under supervision of: Jose Carlos Lino Isabel Valente Dissertation location: University of Minho | 2019/2020 |
Cybersecurity of common data environments of sensitive assets Vítor Ferronato de Lira Work conducted under supervision of: Žiga Turk Dissertation location: University of Ljubljana | 2019/2020 |